Which of the following strategies improves cooling tower water efficiency?
Answer: C Next Question -
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Answer: C Next Question -
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will besubmitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?
Answer: A Next Question -
The environmentally preferable purchasing policy (EPP) required in the Materials and Resources Prerequisite, Ongoing Purchasing and Waste Policy should address the criteria in which Materials and Resource Credit?
Answer: C Next Question -
One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data. For credits related to purchasing, the LEED applicant must
Answer: D Next Question -
For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energyand Atmosphere Prerequisite, Minimum Energy Efficiency Performance by
Answer: D Next Question -
In which of the following ways can a campus project using a Group Approach comply with Water EfficiencyPrerequisite, Building-Level Water Metering?
Answer: D Next Question -
For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?
Answer: A Next Question -
A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System SelectionGuidance, which rating system would be most applicable for this project?
Answer: D Next Question -
Which of the following environmental concerns is exacerbated by impervious surfaces?
Answer: D Next Question