Free HCSA-Presales-Digital Power Exam H19-371_V1.0 Exam Practice Test
H19-371_V1.0 Exam Features
In Just $59 You can Access
- All Official Question Types
- Interactive Web-Based Practice Test Software
- No Installation or 3rd Party Software Required
- Customize your practice sessions (Free Demo)
- 24/7 Customer Support
Total Questions: 655
-
The total current of the battery pack is 1000A, and 3 sets of batteries are configured. The most economical configuration of the cable from the UPS to the main switch box is ( )
Answer: B Next Question -
Which of the following functions or components does the UPS5000-E (50kVA power module) come standard with? ( )
Answer: A, B, C, D Next Question -
In the FusionModule2000 configurator, what are the common cabinet specifications (
Answer: A, B, C, D Next Question -
The self-developed air-conditioning control system has a visual group control network and supports a maximum of 32 units
Answer: A Next Question -
The capacity management module of the NetEco management system can connect with third-party () systems, accept equipment change information, automatically generate a change application form and track the processing process?
Answer: C Next Question -
The name of the controller that controls the sunroof in Fusionmodule2000 is ( )
Answer: C Next Question -
'Data Center Design Specifications' GB50174-2017 stipulates that when selecting a site, a cooling data center should have sufficient water sources.
Answer: C Next Question -
When configuring the cables of the UPS, it is necessary to consider the rated current of the UPS and the voltage drop on the line for selection.
Answer: A Next Question -
Air conditioning water systems include cooling water systems, chilled water systems and condensate water systems.
Answer: A Next Question -
The UPS5000-E battery adopts the design of no neutral line, which is convenient for the battery to be used when replacing the tower.
Answer: B Next Question
Total Questions: 655