  • When the UPS5000-E works in normal mode, in which condition will the UPS automatically transfer to bypass mode?

    Answer: B Next Question
  • Due to simple operations and easy interconnection, which of the following communication types is recommended for NetEco northbound integration?

    Answer: A Next Question
  • In the FusionModule2000, the skylight actuator can control the rotating skylight in the aisle containment of the modular data center.

    Answer: A Next Question
  • For FusionModule2000, depending on different layout position, batteries can be deployed in the smart module or out of the smart module.

    Answer: A Next Question
  • To modify the FusionModule2000 plan view of the ECC800-Pro, users need to log in to the WebUI as admin account.

    Answer: A Next Question
  • When the outdoor unit of a Huawei air-cooled air conditioner is installed horizontally, what is the minimum distance between the outdoor unit and the wall or obstacle?

    Answer: C Next Question
  • A data center is at the Tier IV level and uses Huawei FusionModule2000 smart module. In this smart module, the PDU8000 integrated PDF cannot be used to supply power to IT loads and precision air conditioners at the same time because isolation requirements are not met.

    Answer: B Next Question
  • Three UPS5000-E-400Ks from a 2+1 parallel system. Which of the following statements about the parallel system are true?

    Answer: D Next Question
  • In the FusionModule800 grounding solution, each cabinet is connected to the ground bar of the data center.

    Answer: A Next Question
  • If multiple SmartLi battery cabinets are combined, press and hold the POWER ON/OFF button on each battery management module for more than 2s, and then switch on the battery circuit breaker in any cabinet to start all battery cabinets.

    Answer: A Next Question