Free Dell PowerEdge XE9680 and XE8640 Install Exam D-PEXE-IN-A-00 Exam Practice Test
D-PEXE-IN-A-00 Exam Features
In Just $59 You can Access
- All Official Question Types
- Interactive Web-Based Practice Test Software
- No Installation or 3rd Party Software Required
- Customize your practice sessions (Free Demo)
- 24/7 Customer Support
Total Questions: 14
-
A customer wants to implement 20 PowerEdge XE9680 servers for development and rendering of their studio CGI production. The solution includes a shared development environment with multiple outside partners, professionals, and hobbyists.Due to the heating and cooling limitations of the data center, what GPUs should be used for the servers?
Answer: B Next Question -
A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame.What is the reason the outer rail is not flush with the frame?
Answer: C Next Question -
A deployment engineer is installing a PowerEdge XE8640 server. The rack has four PDUs. Looking at the rear of the rack, one power source provides power to the two left PDUs. A different power source provides power to the two right PDUs.What side of the rack should XE8640 PSU 1 and PSU 2 be connected?
Answer: D Next Question -
A deployment engineer is connecting the network cables on an XE9680 server. The data center administrator wants to know why the server does not have an OCP card for network connectivity.How should the engineer respond to the administrator's query?
Answer: C Next Question -
A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cable management arm (CMA).What are two items to consider when installing a CMA?The CMA can be installed to open on either the left or right side of the server.Do not route optical cables through the CM
Answer: A,B Next Question -
A deployment engineer installed and powered on a XE8640 server. The Linux operating system is installed. They need to update the drivers on the server.What is a consideration before updating the driver?
Answer: B Next Question -
A deployment engineer arrives on-site to install an XE9680 server. The server lift does not have the ability to maneuver beneath the XE9680 shipping pallet.How many people must you have to physically pick up the server to place it on the lift shelf?
Answer: A Next Question -
What must be considered regarding stab-in rails with installing a PowerEdge XE server?
Answer: C Next Question -
A deployment engineer is installing eight PowerEdge XE9680 servers. Two servers will be installed in each of four racks. The data center managers must plan for the power needed to supply power to the four racks.What power consumption information can the deployment engineer give the data center manager?
Answer: B Next Question -
A deployment engineer goes on-site to install a mix of XE systems in a customer testing and development data center. The customer engineering group is stress testing the PowerEdge XE servers todetermine the best XE server for their software applications. As one of the first steps, they must ensure the correct server rails are on-site.Which three options are a correct matching of rail type with server type?
Answer: B,C,E Next Question
Total Questions: 14