Free Certified Software Tester – Intermediate Level (CSTIL) Exam CTIL-001 Exam Practice Test

UNLOCK FULL
CTIL-001 Exam Features
In Just $59 You can Access
  • All Official Question Types
  • Interactive Web-Based Practice Test Software
  • No Installation or 3rd Party Software Required
  • Customize your practice sessions (Free Demo)
  • 24/7 Customer Support
Page: 1 / 5
Total Questions: 25
  • At what point in the test process should you first consider the test environment required for the project?A . When writing the test policy.B . When writing the test strategy.C . With designing the test cases.D . When writing the test procedures.

      Answer: B Next Question
    • Which of the following provides the best example of a product risk leading to a project risk?A . The signalling systems may have more defects than anticipated, leading to the need for more retesting to be carried out.B . There may be unexpected lags on the network traffic communication, causing drivers to slow the trains down unnecessarily.C . The new development staff may require training for this type of system, which, if not carried out, may lead to an increase in the number of defects introduced.D . The budget may need to be increased significantly during the project, otherwise there may be delays in the delivery of the system.

        Answer: A Next Question
      • Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?A . Test policy-Test strategy-Project test plan-System test planB . Test strategy-Test policy-Project test plan-System test planC . Test policy-Project test plan-Test strategy-System test planD . Project test plan-Test strategy-System test plan-Test policy

          Answer: A Next Question
        • Which of the following activities should be carried out at the start of this process?A . Marketing of the service to as many people as possible to reduce the risk of poor revenues.B . Holding a workshop with as many stakeholders as possible to gain their views on the risks to the product and project.C . Meeting with the project manager to agree a bigger budget.D . Meeting with the development manager to agree defect fix turn-around times.

            Answer: B Next Question
          • Which of the following methods of test estimation would be most appropriate for each Sprint?A . Ask the testers to talk to each other and reach a consensus.B . Take 30% of the total development time required for the Sprint.C . Conduct a test point analysis on the content and navigation requirements.D . Use metrics from the last accessibility project at MSC.

              Answer: A Next Question
            • When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?A . A walkthrough.B . A technical review.C . A management review.D . A code inspection.

                Answer: B Next Question
              • Which of the following best describes the difference between the use of walkthroughs and inspections in this scenario?A . Walkthroughs of specifications would enable the individuals to learn more about the system being developed, whilst inspections would allow the organization as a whole to improve.B . Walkthroughs of signalling rules will be more cost effective than inspections.C . Inspections of code should be carried out by the developers, whilst code walkthroughs should include just the testers.D . A walkthrough is an example of a static testing technique, whilst an inspection is an example of a dynamic testing technique.

                  Answer: A Next Question
                • Which of the following test design techniques could be used to do this?

                  Answer: C Next Question
                • Which of the following would be applicable as part of a test policy for testing these types of systems?

                  Answer: B Next Question
                • When a software defect in a system has been found and fixed, which of the following activities should be undertaken next?a.Debugging. b.Confirmation testing. c.Regression testing.d.System testing.e.Static testing.A . a and b.B . b and c.C . c and d.D . c and e.

                    Answer: B Next Question
                  Page: 1 / 5
                  Total Questions: 25