Free ISTQB Certified Tester Foundation Level (CTFL) v4.0 Exam CTFL_Syll_4.0 Exam Practice Test
CTFL_Syll_4.0 Exam Features
In Just $59 You can Access
- All Official Question Types
- Interactive Web-Based Practice Test Software
- No Installation or 3rd Party Software Required
- Customize your practice sessions (Free Demo)
- 24/7 Customer Support
Total Questions: 151
-
A document describes the test procedures that have been derived for the identified test sets. Among other things, the order in which the test cases in the corresponding test set are to be executed according to the dependencies described by preconditions and postconditions is specified. This document is a typical work product produced as part of:
Answer: C Next Question -
Which of the following statements about the typical activities of a formal review process is true?
Answer: C Next Question -
For a given set of test-cases, which of the following is a benefit of running these tests with a test automation tool?
Answer: B Next Question -
As a tester, as part of a V-model project, you are currently executing some tests aimed at verifying if a mobile app asks the user to grant the proper access permissions during the installation process and after the installation process. The requirements specification states that in both cases the app shall ask the user to grant access permissions only to the camera and photos stored on the device.However, you observe that the app also asks the user to grant access permission to all contacts on the device. Consider the following items:
Answer: B Next Question -
Consider an estimation session in which a six-member Agile team (Membl,..., Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1. 2, 3, 5, 8,13, 21. Below is the outcome of the first round of estimation for this session:Membl = 3 Memb2 = 3 Memb3 = 3Memb4 = 21 Memb5 = 3 Memb6 = 1Which of the following answers best describes how the estimation session should proceed?
Answer: D Next Question -
You are a tester working on a critical project. Based on the risk analysis you need to decide on the order of test execution. Which of the following lists the correct sequence of test execution? Priority 1 is the highest and Priority 3 is the lowest priority.Test Case Priority Dependencies Test A 3 -Test B 1 TestDTestC 2 Test ATest D 3 •D-C- B-AD-B-A-CD-A-B-CC-B-A-D
Answer: B Next Question -
Mark the correct sentences:Defects are a result of environmental conditions and are also referred to as "Failures"A human mistake may produce a defectA system mil totally fail to operate correctly when a failure exists in itWhen a defect exists in a system it may result in a failureDefects occur only as a result of technology changes
Answer: A Next Question -
Which of the following lists factors That contribute to PROJECT risks?
Answer: A Next Question -
Which of the following statements about impact of DevOps on testing is CORRECT?
Answer: A Next Question -
Which of the following is an advantage of the whole team approach?
Answer: D Next Question
Total Questions: 151