  • Which testing metric identifies defect density? [1]

    Answer: B Next Question
  • SoftTech provides a core banking product to retail banks to enable their customers to process payments via the Internet and telephone banking and. as SoftTech's Test Manager, you are responsible for system testing and system integration testing of all SoftTech's products.Your current project is to integrate SoftTech's core banking product with an existing bank's systems, which are maintained by experienced developers but poorlydocumented.A specification for the 10 interfaces to the bank's existing systems has been produced by SoftTech's development team. There is an estimating matrix for system integration testing that allows 2 man days per interface for preparation, plus 2 man days per interface for test execution. The exit criteria for the completion of system integration testing has been agreed as:

    Answer: A Next Question
  • You are the manager of a test team. You inherited most of these people from a previous manager who promoted technical skills, particularlyprogramming skills. As a result, your people are very strong in test automation skills, white box testing and complex test designtechniques. You have just been told that you can hire five new people. You want the new people to complement the existing skill sets andyou want to be sure the team will have a strong mutual respect. Given the following options, who should you hire? [3]

    Answer: C Next Question
  • Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to renew or cancel their permit each year.The test plan states the following:"since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing"Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan?SELECT ONE OPTION

    Answer: A Next Question
  • Consider the following scenario:Your customer is closely involved in the development project. Requirements are communicated verbally and rarely written down. An iterative development model is being followed and time boxing is used to stay on schedule.Which of the following statements is true? [3]

    Answer: C Next Question
  • In relation to cost of quality, which of the following would be classified as a cost of detection? SELECT ONE OPTION

    Answer: D Next Question
  • Which ONE of the following is considered to be the LEAST independent form of testing for an organisation? SELECT ONE OPTION

    Answer: C Next Question
  • Which of the following is NOT true when following the V-Model lifecycle to organise and plan testing activities? SELECT ONE OPTION

    Answer: D Next Question
  • The Test Manager must assemble team members that have which of the following characteristics? [1]

    Answer: C Next Question
  • Which of the following describes the Failure Mode and Effect Analysis (FMEA) risk analysis technique? SELECT ONE OPTION

    Answer: C Next Question
Page: 1 / 5
Total Questions: 0