Free Six Sigma Black Belt CSSBB Exam Practice Test

UNLOCK FULL
CSSBB Exam Features
In Just $59 You can Access
  • All Official Question Types
  • Interactive Web-Based Practice Test Software
  • No Installation or 3rd Party Software Required
  • Customize your practice sessions (Free Demo)
  • 24/7 Customer Support
Page: 1 / 60
Total Questions: 300
  • To be an effective Lean Six Sigma practitioner one must understand the difference between ___________________________.

    Answer: D Next Question
  • The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.

    Answer: C Next Question
  • For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?

    Answer: D Next Question
  • The distance between the Mean of a data set and the Point of Inflection on a Normal curve is called the _______________.

    Answer: B Next Question
  • As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

    Answer: B Next Question
  • Which item(s) listed would impact the Process Capability for a process with a continuous output? (Note: There are 4 correct answers).

    Answer: A,C,D,E Next Question
  • Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other.

    Answer: C Next Question
  • Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).

    Answer: A Next Question
  • When conducting a Hypothesis Test using Continuous Data the proper sample size is influenced by the extent to which we need to assess a Difference to be detected and the inherent variation in the process.

    Answer: A Next Question
  • Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ________.

    Answer: A Next Question
Page: 1 / 60
Total Questions: 300