Free Six Sigma Black Belt CSSBB Exam Practice Test
CSSBB Exam Features
In Just $59 You can Access
- All Official Question Types
- Interactive Web-Based Practice Test Software
- No Installation or 3rd Party Software Required
- Customize your practice sessions (Free Demo)
- 24/7 Customer Support
Total Questions: 300
-
To be an effective Lean Six Sigma practitioner one must understand the difference between ___________________________.
Answer: D Next Question -
The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.
Answer: C Next Question -
For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?
Answer: D Next Question -
The distance between the Mean of a data set and the Point of Inflection on a Normal curve is called the _______________.
Answer: B Next Question -
As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.
Answer: B Next Question -
Which item(s) listed would impact the Process Capability for a process with a continuous output? (Note: There are 4 correct answers).
Answer: A,C,D,E Next Question -
Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other.
Answer: C Next Question -
Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).
Answer: A Next Question -
When conducting a Hypothesis Test using Continuous Data the proper sample size is influenced by the extent to which we need to assess a Difference to be detected and the inherent variation in the process.
Answer: A Next Question -
Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ________.
Answer: A Next Question
Total Questions: 300