Free CSQA Certified Software Quality Analyst CSQA Exam Practice Test

UNLOCK FULL
CSQA Exam Features
In Just $59 You can Access
  • All Official Question Types
  • Interactive Web-Based Practice Test Software
  • No Installation or 3rd Party Software Required
  • Customize your practice sessions (Free Demo)
  • 24/7 Customer Support
Page: 1 / 128
Total Questions: 639
  • - (Exam Topic 4) To validate that the COTS software will meet the functional and structural needs of the user, both ________________ and _______________ Testing is performed.

    Answer: B Next Question
  • - (Exam Topic 4) The quality gap for a software product would be considered:

    Answer: A Next Question
  • - (Exam Topic 1) Which of the following is a level for maturing the Quality Assurance Processes?

    Answer: A Next Question
  • - (Exam Topic 6) What are the three components of Cost of Quality? Which one(s) should be increased to reduce overall costs? Why does this work? Type your answer in the box provided. Use options on the box toolbar to edit your response as needed before moving to the next question.

      Answer: see,explanation,,There,are,three,COQ,categories:,,Prevention,-,Money,required,preventing,errors,and,to,do,the,job,right,the,first,time,is,considered,prevention,cost.,This,category,includes,money,spent,on,establishing,methods,and,procedures,,training,workers,and,planning,for,quality.,Prevention,money,is,all,spent,before,the,product,is,actually,built.,,Appraisal,–,Appraisal,costs,cover,money,spent,to,review,completed,products,against,requirements.,Appraisal,includes,the,cost,of,inspections,,testing,and,reviews.,This,money,is,spent,after,the,product,or,subcomponents,are,built,but,before,it,is,shipped,to,the,user.,,Failure,–,Failure,costs,are,all,costs,associated,with,defective,products.,Some,failure,costs,involve,repairing,products,to,make,them,meet,requirements.,Others,are,costs,generated,by,failures,,such,as,the,cost,of,operating,faulty,products,,damage,incurred,by,using,them,and,the,costs,incurred,because,the,product,is,not,available.,The,user,or,customer,of,the,organization,may,also,experience,failure,costs. Next Question
    • - (Exam Topic 1) While unit testing should be done, it is not necessary to spend the time and effort to develop and document the unit test plan and cases because it is conducted by the developers themselves.

      Answer: B Next Question
    • - (Exam Topic 1) Which of the following is the correct definition of the Quality Attribute Maintainability?

      Answer: B Next Question
    • - (Exam Topic 2) It is generally recognized that software testing should begin at which software development phase?

      Answer: A Next Question
    • - (Exam Topic 2) Which of the following is not normally included in a contract for an outside organization to develop software for your use?

      Answer: A Next Question
    • - (Exam Topic 1) In the broad context of comparing quality assurance activities and quality control activities in an IT organization, which of the following would be considered a quality assurance activity?

      Answer: C Next Question
    • - (Exam Topic 5) Cause-and-effect graphing is a tool used to:

      Answer: B Next Question
    Page: 1 / 128
    Total Questions: 639